Green Empire Farms

Project included: Electrical Services, Distribution, Substation

Installation and commissioning of a 50 MVA 115kV/13.8kV substation including 45,000 feet of underground distribution circuits, 21 transformers and switchgear for largest single build greenhouse in North America.

Passaic Valley Sewerage Authority

Project included: Electrical Services, Distribution

Installation of a 5kV/15kV overhead power line system for the Passaic Valley Sewerage Authority. This emergency backup system was laid out and engineered by Metrotek to provide the Authority with emergency backup capabilities in case of future flooding or unexpected electrical routing failures.

Buzzi Unicem & Lehigh Cement

Project Included: 24/7 Emergency Response

Emergency repair services for a behind-the-meter 34.5kV overhead circuit damaged by a lightning strike, and of an overhead circuit mistakenly cut by an on-site contractor.

Borough of Lehighton

Project included: Electrical Services, Distribution

Installation of a 12.8 kV high-voltage power line reconductoring project for Lehighton Borough, County of Carbon Pennsylvania.

Specific work included the removal and replacement of the existing primary conductors for the three phase system and conductors for selected single and multi-phase tap offs.

Los Morelos Solar Substation

Project included: Electrical Services, Substation

Installation of a 20MVA solar substation in the Californian desert including coordination of excavation, civil construction, electrical connections and terminations of this impressive substation structure built to link a pending solar facility to the local utility grid.

Novartis Oncology Solar Installation

Project included: Renewable Energy