Installation and commissioning of a 50 MVA 115kV/13.8kV substation including 45,000 feet of underground distribution circuits, 21 transformers and switchgear for largest single build greenhouse in North America.
Installation of a 5kV/15kV overhead power line system for the Passaic Valley Sewerage Authority. This emergency backup system was laid out and engineered by Metrotek to provide the Authority with emergency backup capabilities in case of future flooding or unexpected electrical routing failures.
Emergency repair services for a behind-the-meter 34.5kV overhead circuit damaged by a lightning strike, and of an overhead circuit mistakenly cut by an on-site contractor.
Installation of a 20MVA solar substation in the Californian desert including coordination of excavation, civil construction, electrical connections and terminations of this impressive substation structure built to link a pending solar facility to the local utility grid.