Passaic Valley Sewage

  • Project Overview

    MetroTek Electrical Services, as part of repairs due to Hurricane Sandy, installed a temporary 5kV/15kV overhead power line system for the Passaic Valley Sewerage Authority. This emergency backup system was laid out and engineered by MetroTek. Construction spanned ten months and difficult weather, but MetroTek was able to complete the project within the project timeline. This system now provides the Authority with emergency backup capabilities in case of future flooding or unexpected electrical routing failures.